Contact

Start with the mission need

Cislune is interested in NASA program integration, prime partnerships, commercial space collaborations, early technical exchanges, research work, test campaigns, prototype logistics, and agency transition paths.

Cislune laser cutting, welding, and fast fabrication capability
Use the first conversation to connect a mission need with Cislune’s build, test, simulation, and field capability.

Useful first email

Enough context to start, without oversharing.

For the fastest useful conversation, include the mission requirement, target program or customer, desired demonstration, timeline, and whether the discussion should move under NDA.

NASA and agencies

Mission integration, technology maturation, test support, lunar surface infrastructure planning, and Phase III when appropriate.

Prime contractors

Subsystem studies, test campaigns, mission rehearsal, autonomy/simulation support, lunar infrastructure concepts, and commercial project support.

Commercial space companies

ISRU, construction, logistics, field demonstrations, surface operations, early technical exchange, and customer-funded transition planning.

Research collaborators

Regolith, robotics, autonomy, excavation, simulation, volatile preservation, and surface systems work.

Field and logistics support

Prototype transport, test-site support, BrightDrop van capability, and equipment movement.

Media and speaking

Concise public explanations of lunar surface infrastructure, ISRU, and Cislune’s hardware-first work.

PERDEX excavation hardware detail after successful build and testing
Tested excavation hardware.
CARVE terrain planning view for robotic site preparation
Simulation and surface planning.
SimMoon lunar operations rehearsal environment
Mission rehearsal and operator-training context.
Cislune fabrication and integration workspace
Fabrication and integration workspace.
BrightDrop cargo-area view for prototype transport and field logistics
Prototype transport logistics.
LunaRecycle process evidence for resource-handling work
Resource-handling demonstration evidence.

What a partner can see quickly

Hardware, simulation, shop capability, and field logistics

PERDEX hardware alternate view for excavation and ISRU integration
Excavation hardware detail.
TREAD hardware setup for granular mobility testing
Mobility test setup.
Cislune fabrication equipment detail for rapid prototype cycles
Fabrication capability.
Cislune furnace and thermal processing view
Thermal processing.
BrightDrop field logistics view for demonstration support
Field logistics.
Break the Ice field view for excavation and resource handling
Analog excavation operations.