Cislune has completed our 15 day BTILC Level 2 durability demonstration test with over 3300kg of regolith excavated and transported.
Cislune won Phase 2 Level 1 along with 12 other US teams. In Phase 2 Level 2 each team has to setup a field test site to excavate 12 metric tons of CLSM (controlled low strength material) concrete with a compressive strength of 1.5-2 MPa (217 psi) or greater. We developed a robotic excavator with fore and aft bucket drums and worked with Adrian Stoica and his LUVTA 2 lunar proving ground and excavated and poured 20 cubic yards of CLSM to excavate during the competition starting 09/10/2023.
[countup date=2023/09/10-15:00:00] [timer] elapsed of 15 day competition [/countup]
| Date | kg Excavated |
| 9/10/23 | 19.1 |
| 9/11/23 | 93.0 |
| 9/12/23 | 120.7 |
| 9/13/23 | 223.6 |
| 9/14/23 | 242.7 |
| 9/15/23 | 120.7 |
| 9/16/23 | 166.5 |
| 9/17/23 | 337.0 |
| 9/18/23 | 303.9 |
| 9/19/23 | 411.9 |
| 9/20/23 | 336.6 |
| 9/21/23 | 241.8 |
| 9/22/23 | 227.2 |
| 9/23/23 | 283.9 |
| 9/24/23 | 154.7… |
| 3283.1 |