Cislune Excavators


Break the Ice Challenge Phase 2 Level 2 Competition Updates

Cislune has completed our 15 day BTILC Level 2 durability demonstration test with over 3300kg of regolith excavated and transported.

Cislune won Phase 2 Level 1 along with 12 other US teams. In Phase 2 Level 2 each team has to setup a field test site to excavate 12 metric tons of CLSM (controlled low strength material) concrete with a compressive strength of 1.5-2 MPa (217 psi) or greater. We developed a robotic excavator with fore and aft bucket drums and worked with Adrian Stoica and his LUVTA 2 lunar proving ground and excavated and poured 20 cubic yards of CLSM to excavate during the competition starting 09/10/2023.

468 days 10 hours 38 minutes 17 seconds elapsed of 15 day competition

Datekg Excavated
9/10/2319.1
9/11/2393.0
9/12/23120.7
9/13/23223.6
9/14/23242.7
9/15/23120.7
9/16/23166.5
9/17/23337.0
9/18/23303.9
9/19/23411.9
9/20/23336.6
9/21/23241.8
9/22/23227.2
9/23/23283.9
9/24/23154.7…
3283.1
Box truck transport of excavator, spares, and tools
Initial excavation of test site, getting ready for pour of concrete
Tarp covering of excavated area
CLSM pour
CLSM leveling